Overlay to existing asphalt main roof area and removal of failing Roof Lights
The material used Soprema Flagon
The Original roof coverings, coping stones and roof lights allowed water to enter the Building.
Following our survey, we were able to suggest a waterproofing solution that encapsulated all of the problem areas.
Soprema Flagon Single ply membrane was fully bonded to the existing Asphalt coverings and parapet upstands. As the pumping Station is largely unmanned, we were also able to remove the Rooflight domes.
Client received a 25 year Guarantee on completion of the works